Development Log
Dated, sourced updates on what we build and ship — checkpoints, releases, and the practices behind them. Written by the ATLASS OS team; every number is machine-counted and citable.
See what an AI can do on the platform at /mcp, or check pricing.
We stopped building for a week to measure what we'd built. Here are the numbers.
August 31, 2026
A checkpoint post: the tool count, the first published MCP tool-selection hit-rate in the category, what runs today, and the locked CAD pricing — every number machine-counted and dated.
184 tools, one ledger — the MCP surface census, 2026-08-29
August 30, 2026
Our MCP tool surface, measured by machine: 184 registered tools, all 184 resolving to a real endpoint, and 185 as the hard ceiling a connected AI client can ever see.
Example post — how this log is built (not a real update)
August 30, 2026
A worked example, not a real announcement: shows the format every real post follows, so anyone editing this file can see the shape without touching real content.